This page traces one real entity, z9 codex-plugin-auto-install, from backlog through to done / PASSED, using artifacts that live in this repo. It is a concrete read of the abstract stage machine: backlog → ideation → implementation → validation → done, the gates between them, and what the captain actually decides at each one.

The workflow is docs/dev (the Spacedock v1 dev workflow); its stages, gates, and entity schema are defined in the development workflow reference. Runtime entity state lives in a separate .spacedock-state checkout, so the finished entity itself is not in the main tree, but its full trajectory is on the record in the 0198-pre-flip-hardening sprint directory: index.md, dispatch-sprint-execution.md, debrief.md, and post-sprint-audit.md.

z9 delivered front-door Codex plugin auto-install: spacedock codex now installs a missing plugin then launches, the Codex analog of the Claude path. It shipped as PR #329.

See where it sits

Each first-officer loop starts by asking the workflow what is ready to move. You run the same query:

spacedock status --workflow-dir docs/dev --next

Lists the entities ready to dispatch. To scope to one sprint, filter with --where:

spacedock status --workflow-dir docs/dev \
  --where sprint=0198-pre-flip-hardening --where 'sprint-readiness != defer'

This is the sprint membership query, the source of truth, not a hand-kept list. At the start of 0198, z9 shows up here in the binary-ux group.

backlog → ideation: shape the work

z9 enters backlog as a seed: a title, a source, and a brief description of the problem. It carries no design yet. Ideation is where a worker fleshes it out into a problem statement, a proposed approach, entity-level acceptance criteria, and a test plan, with each AC naming a check outside the entity body that can fail.

For z9 that meant a concrete approach: install through the shared devBranch rather than a hardcoded "next", so the install channel tracks the release channel (next today, main after the flip). The design also resolved the riskiest unknown up front (that the install branch was the channel variable, not a literal) and recorded it before committing to the rest of the plan.

Ideation ends at a gate. Because the dev workflow marks ideation with gate: true, the first officer does not advance on its own: it presents the design to the captain. The captain approved z9's ideation on 2026-06-08. That approval is the entry condition for implementation, and it is captured in the sprint package so a later Commander session drives implementation directly without re-presenting the gate.

implementation: produce the deliverable

Once the design is approved, z9 moves to implementation. The dev workflow runs this stage in a worktree (worktree: true), so the dispatched ensign works in an isolated checkout, not the shared tree.

The dispatch package gave the implementer three concrete build notes, all of which the work honored:

  • Install on the shared devBranch, via ops.Install("codex", marketplaceSource, devBranch) and --ref <devBranch>, not a hardcoded next, so the channel tracks the flip's later devBranch retarget.
  • Fix the now-false comments and error strings it builds around (host_exec.go, frontdoor.go), rather than adding new code around stale text.
  • Invert the obsolete test TestCodexFrontDoorNoPluginFailsFastWithoutInstalling, whose old assertion contradicted the new auto-install behavior.

Implementation is complete when the deliverable is committed and the stage report is filed. It is not a parking spot: a completed implementation routes straight to validation dispatch.

validation: verify against the criteria

z9 moves to validation to be checked, not finished. The dev workflow marks validation with fresh: true and worktree: true, so a fresh validator (one that did not write the code) runs in its own worktree. It pulls every AC-N from the entity's acceptance-criteria section, reproduces the evidence each one cites, and produces a PASSED or REJECTED recommendation.

z9 is a front-door change, a high-stakes surface, so validation alone was not sufficient. The dev workflow requires a detached adversarial audit for the launcher front door: a read-only pass on a throwaway checkout of the merge result that tries to refute the validation. The z9 audit ran at commit 0b714fac and exercised five mandated probes, each reddening the test suite then reverting. It refuted nothing material. Channel-tracking was confirmed clean. That clean audit satisfied the sprint's DoD item for the high-stakes surface.

Validation also has gate: true and feedback-to: implementation. A REJECTED recommendation routes the finding back to implementation for another cycle; a PASSED recommendation goes to the captain for the terminal decision.

done: the captain's verdict

z9 reaches done when the captain reads the validation report and approves. The terminal stage records the outcome in frontmatter: status: done, verdict: PASSED, and a completed timestamp. The sprint's post-sprint-audit.md confirms z9 finished status: done, verdict: PASSED, archived, with PR reference #329, alongside its three sprint siblings (kb #327, qa #328, vh #330).

That is the whole point of the machine: nothing reached done on assertion alone. z9 advanced only on an approved design, an isolated implementation, a fresh validation, a detached audit that failed to break it, and an explicit captain verdict. Each one a decision, each one on the record.

Read the trail yourself

The full trajectory is reconstructable from the sprint directory: